Activity-Based Costing Examples + Cross-Subsidization


In this managerial accounting lecture video, Activity-Based Costing examples with discussion on cross-subsidization and comparison of simple costing and ABC are discussed (transcript is below).


TRANSCRIPT
10
00:00:44.430 --> 00:00:55.590
Brian Routh: So I believe last time we got to this problem, and this is where we stopped Is this correct for everyone, where we are in the notes, yes okay very good.

11
00:00:57.240 --> 00:01:06.690
Brian Routh: So cougar testing laboratories does heat testing and stress testing on materials and operates at capacity under its current simple costing system.

12
00:01:07.260 --> 00:01:13.590
Brian Routh: Now, remember, at this point, we have two types of systems that we're looking at we've got simple costing which used one allocation right.

13
00:01:13.950 --> 00:01:19.950
Brian Routh: And we do Activity Based costing which is multiple activity rates Okay, so you got to be able to pick out this information.

14
00:01:20.820 --> 00:01:33.660
Brian Routh: So currently we're using a simple costing system that's what we currently are using cougar aggregates all operating cost of $1,280,000 into a single overhead costs pool.

15
00:01:34.680 --> 00:01:48.660
Brian Routh: Cooper calculates a rate per test our of $16 okay so that's our current simple costing rate that we use to allocate all call $16 and the way we got, that is to take our total estimated overhead of 1,280,000.

16
00:01:49.560 --> 00:01:58.770
Brian Routh: And we're allocating it based on test hours, so we divided by the total test hours so that's nothing new that's the way we know how to create our rate and allocate the cost.

17
00:01:59.610 --> 00:02:05.010
Brian Routh: Alright, so he tests uses 50,000 test hours in stress test uses.

18
00:02:05.550 --> 00:02:17.220
Brian Routh: 30,000 test hours late them Claire cooper's controller believes that there is enough variation in test procedures and cost structures to establish separate costing and billing rates for heat test and stress test.

19
00:02:17.850 --> 00:02:27.540
Brian Routh: The market for test services is becoming competitive without this information and we saw that last time we saw how having miss costed information.

20
00:02:27.930 --> 00:02:38.130
Brian Routh: can cause us to go out of business okay so that's what they're thinking here is their competition is getting or the competition is getting more fierce so they have to be cost competitive.

21
00:02:39.150 --> 00:02:43.440
Brian Routh: Alright, so clear divides cooper's cost and before activity cost categories, the first one.

22
00:02:44.010 --> 00:02:53.460
Brian Routh: Our direct costs okay so keep that in mind, those are direct costs, we know direct costs are directly traceable back to the products there's nothing we have to allocate there.

23
00:02:54.090 --> 00:03:07.680
Brian Routh: Though they'll they'll last three of those these are indirect or overhead costs so those we're going to have to allocate on some method now once we do all this, the ultimate question is.

24
00:03:08.820 --> 00:03:20.520
Brian Routh: Once we calculate the cost per test our we're going to explain the reasons why these numbers differ from the $16 per test our, then we should already probably know the answer that even without singing.

25
00:03:21.030 --> 00:03:30.210
Brian Routh: The race that we're going to calculate under Activity Based costing but that's the ultimate goal in this problem okay it's to compare simple costing with Activity Based costing and what the ultimate.

26
00:03:31.020 --> 00:03:38.640
Brian Routh: outcome could possibly be alright so let's go to the little spreadsheet that you should have this in the lecture notes, if you print these out.

27
00:03:39.780 --> 00:03:40.560
Brian Routh: Right it's not.

28
00:03:41.640 --> 00:03:42.810
Brian Routh: got a lot of writing today but.

29
00:03:43.830 --> 00:03:52.230
Brian Routh: Hopefully, have these in front of you So the first thing we're going to do is do the direct Labor which is given to us, they tell us in the story.

30
00:03:52.590 --> 00:04:02.100
Brian Routh: So I brought the pertinent information here in this little blue box, this is just direct Labor we're going to do these in pieces okay so right now we're just doing the direct direct Labor part.

31
00:04:02.760 --> 00:04:15.630
Brian Routh: They tell us that total direct Labor is $240,000 that's total these calls can be directly traced to heat test and stress test so 180 3000 is going directly to heat tests.

32
00:04:16.650 --> 00:04:20.520
Brian Routh: And 60,000 is going directly to stress test.

33
00:04:21.900 --> 00:04:38.130
Brian Routh: Now, remember our ultimate goal is to get a per test our so notice I have her hour for each, so this is almost like two columns within this one column here, and this is the number we're ultimate looking for.

34
00:04:39.210 --> 00:04:43.560
Brian Routh: Because that will be the total cost of each test our once we're finished.

35
00:04:44.580 --> 00:04:51.630
Brian Routh: So now, I need this direct Labor on a per hour basis well they tell me in the story we go back.

36
00:04:52.920 --> 00:05:07.440
Brian Routh: They tell me that there are 50,000 heat tests hours and stress test uses 30,000 test hours so i'm going to write this, and so I don't forget it so 50,000 test hours.

37
00:05:09.030 --> 00:05:10.920
Brian Routh: And stress test uses.

38
00:05:12.270 --> 00:05:12.960
Brian Routh: 30,000.

39
00:05:14.130 --> 00:05:14.790
Brian Routh: test hours.

40
00:05:16.740 --> 00:05:18.120
Brian Routh: So that was given to us.

41
00:05:20.460 --> 00:05:27.120
Brian Routh: Now, remember, I wanted to own a per hour basis so to get that I would take the 183.

42
00:05:29.130 --> 00:05:47.190
Brian Routh: And divide it by the 50,000 test hours, and that would give me that on a per hour basis i'll take over here the 60,000 divided by 30,000 hours, and that when I can do in my head that's $2 per test our somebody want to give me the heat test per per hour, please.

47
00:06:00.120 --> 00:06:16.620
Brian Routh: Now, in that one we didn't have to calculate a rate right because direct costs are directly traceable back to a product now in the next three we're going to have to follow our process step one calculate the rate allocate the cost okay so two steps need to process all right.

48
00:06:17.790 --> 00:06:20.280
Brian Routh: So let's go to the equipment related costs.

49
00:06:22.260 --> 00:06:22.950
Brian Routh: Right.

50
00:06:25.350 --> 00:06:35.790
Brian Routh: OK so again step one and i'm gonna do it down here to give myself enough enough room is to calculate the rate pay for this particular activity.

51
00:06:36.390 --> 00:06:52.470
Brian Routh: equipment related costs, so the information, again I put here in the Center equipment related to cost a $400,000 are allocated to heat tests and stress test on the basis of test hours So the first thing we have to figure out the allocation base in this case it actually is test hours.

52
00:06:53.820 --> 00:07:00.270
Brian Routh: Okay that's our allocation base so we want to take our total cost so 400,000.

53
00:07:01.710 --> 00:07:14.250
Brian Routh: and divided by our total allocation base well in this case is test hours so again, we have 50,008 test hours and 30,000 hours to stress test there's 80,000 hours total.

54
00:07:19.770 --> 00:07:21.150
Brian Routh: And that will give me my rate.

55
00:07:24.240 --> 00:07:25.770
Brian Routh: $5 I think.

56
00:07:28.410 --> 00:07:29.520
Brian Routh: check my math on that.

57
00:07:29.790 --> 00:07:32.040
Brian Routh: Think that's right perfect Thank you.

58
00:07:32.550 --> 00:07:33.840
Brian Routh: $5 per test our.

59
00:07:34.260 --> 00:07:41.190
Brian Routh: that's step one now we use the rate to allocate the cost and we're only doing equipment related costs right now okay so.

60
00:07:42.210 --> 00:07:52.380
Brian Routh: We won't like that $5 rate and multiply it times the activity consumed by each type of test, so he tests took 50,000 hours.

61
00:07:54.030 --> 00:07:59.220
Brian Routh: And that's $250,000 I believe.

62
00:08:01.170 --> 00:08:08.160
Brian Routh: And my rate times the consumption of stress test hours was 30,000 hours.

63
00:08:09.210 --> 00:08:13.740
Brian Routh: And that's 150,000 leads.

64
00:08:15.300 --> 00:08:16.710
Brian Routh: So we're part of the way there.

65
00:08:18.090 --> 00:08:21.360
Brian Routh: Now we need to take and get our her our.

66
00:08:22.560 --> 00:08:25.170
Brian Routh: Number so again the 250.

67
00:08:27.300 --> 00:08:29.550
Brian Routh: divided by the 50,000 hours.

68
00:08:31.830 --> 00:08:44.700
Brian Routh: Whatever that happens to be in this case it's actually the same as the rate, because the test hours is our allocation base but that's not always going to be the case, particularly these next two okay so that's not always going to be the right number.

69
00:08:45.720 --> 00:08:56.520
Brian Routh: And then we're going to do the same thing over here under $50,000 divided by the total hours and that's $5 steel okay.

70
00:08:58.560 --> 00:08:59.160
Brian Routh: Now again.

71
00:09:01.020 --> 00:09:09.960
Brian Routh: Taking this number dividing it by that to get my rate okay that's what we're doing in every single one.

72
00:09:11.370 --> 00:09:14.820
Brian Routh: Right that's the process, take the total divided by the number of hours to get.

73
00:09:16.410 --> 00:09:17.460
Brian Routh: The cost per hour.

74
00:09:20.610 --> 00:09:22.410
Brian Routh: Any questions on this process.

77
00:09:34.320 --> 00:09:36.960
Brian Routh: Thank you you're very welcome so remember take the rate.

78
00:09:37.380 --> 00:09:47.760
Brian Routh: Times whatever it's the activity is consuming Okay, so in this case, this heat tests are consuming 50,000 test hours, the stress tests are consuming 30,000 test hours.

79
00:09:48.540 --> 00:10:01.380
Brian Routh: Because for equipment related cost the cost driver was test hours, but for the next two types of cost test, ours is not the allocation base, you have to be careful okay any other questions so far.

80
00:10:06.600 --> 00:10:10.080
Brian Routh: Alright, so here's the rest of the problem.

81
00:10:11.400 --> 00:10:22.740
Brian Routh: And i'm actually gonna put you into breakout rooms here really quickly for just a few minutes now we need to finish this together, and then i'll bring us back here in just a minute.

93
00:20:15.060 --> 00:20:21.420
Brian Routh: So just to confirm when I see you all in breakout rooms, you can no longer see my screen is that right okay.

94
00:20:44.220 --> 00:20:53.970
Brian Routh: Okay, so I think I got to speak with all of the the teams at least briefly about this and if I missed you I apologize.

95
00:20:55.320 --> 00:21:01.260
Brian Routh: So here's what we stopped as a as a group so let's move on to setup costs so remember.

96
00:21:02.130 --> 00:21:10.290
Brian Routh: Since Chapter three when we start to about job costing we know, the first step is to calculate the rate, the second step is to take the rate and allocate the cost.

97
00:21:10.950 --> 00:21:21.720
Brian Routh: Well, that would give us the cost in this total column, can you see my mouse moving moving at all you can okay very good so that would give us this number in the total column so after this point that's all old stuff.

98
00:21:22.230 --> 00:21:32.610
Brian Routh: This problem actually wants you to go a step further it won't sit on the basis of test our so we have to then take this amount divided by the total of.

99
00:21:33.120 --> 00:21:42.360
Brian Routh: test hours for this particular test, and that would give us our rate so you'd have to do that for each one okay so let's go ahead and look at setup costs.

100
00:21:43.860 --> 00:21:47.970
Brian Routh: So setup costs, the total was $385,000.

101
00:21:49.290 --> 00:22:01.710
Brian Routh: This is the amount of calls that we're trying to allocate and they're allocated based on set up hours and he tests require 13,500 setup hours stress test required 4000 set up our.

102
00:22:02.220 --> 00:22:17.790
Brian Routh: Step one is to calculate the rate, so you take your total overhead costs in this case indirect cost divided by total allocation base so 17,500 hours gives us $22 per set up our so again it's it's.

103
00:22:18.390 --> 00:22:27.540
Brian Routh: pretty important to go ahead and stick this verbiage, at the end of your rate because that's going to help you see the rest of it Okay, so this is $22 per set up our.

104
00:22:28.380 --> 00:22:39.750
Brian Routh: So then we're going to multiply it times the number of setup hours consumed by each test, so he tests consumed 13,500 hours gives us $297,000.

105
00:22:40.260 --> 00:22:55.740
Brian Routh: But, again I want that, on a per test basis, well, the number of test hours for the heat test were 50,000 hours so $297,000 divided by 50,000 hours gives me $5 and 94 cents per hour.

106
00:22:57.750 --> 00:23:10.890
Brian Routh: For stress test my rate was still $22 per set up our you multiply it times the number of setup hours consumed by stress test which were 4000 hours that gives me a total cost of $88,000.

107
00:23:11.310 --> 00:23:27.750
Brian Routh: divide that by the number of hours consumed by the stress test which were 30,000 hours gives me the cost per test our for our setup costs three $2 and 93 cents per hour okay any questions i'll set up costs.

108
00:23:32.490 --> 00:23:33.300
Brian Routh: everybody's okay.

109
00:23:34.800 --> 00:23:49.680
Brian Routh: All right, let's look at cost of designing I won't go through this one as in detail, as I did the other ones just for sake of time, so look at cost of designing test, and let me know if you have any questions about that one, so we get $3 and 36 cents per test our.

110
00:23:51.390 --> 00:23:54.900
Brian Routh: For heat test and $2 and 80 cents per hour for stress test.

111
00:23:56.970 --> 00:24:01.890
Brian Routh: And our rate was $60 per design test our to get our total numbers here.

112
00:24:07.530 --> 00:24:11.880
Brian Routh: Any questions on the process here on cost of designing.

113
00:24:13.680 --> 00:24:16.560
Brian Routh: um I just had a quick question for like thing the.

120
00:24:50.040 --> 00:24:58.290
Brian Routh: But very good question but theoretically, we could but it wouldn't really make any productive information for us there.

121
00:24:59.970 --> 00:25:01.020
Brian Routh: That other questions.

122
00:25:05.160 --> 00:25:17.850
Brian Routh: All right, just scanning through to make sure I don't see any bewildered bewildered looks on anybody okay so let's um let's didn't finish the problems, this is not quite all of it now we want to get the total the totals here.

123
00:25:18.870 --> 00:25:28.860
Brian Routh: So a couple of ways, you can do this, you could take the total all the way down each column and get the total and then take the total and divide by number of test hours.

124
00:25:29.850 --> 00:25:41.190
Brian Routh: Total divided by number of test hours within give me this number or you could take the test our numbers and just add down but don't forget the direct Labor that's part of the cost.

125
00:25:42.270 --> 00:25:51.030
Brian Routh: Okay, so you'd have to $3 and 66 cents plus $5 plus 594 plus 336 to give me to $17 and 96 cents per hour.

126
00:25:52.830 --> 00:25:59.580
Brian Routh: Okay, another thing you could always think of to kind of check yourself is this was the cost, we were trying to allocate.

127
00:26:00.690 --> 00:26:19.350
Brian Routh: That was the total cost in the in the in the main problem $1,280,000 that's the amount we should have allocated to all of our activities well, if you take the 898 plus the 382 that should equal the 1,280,000

134
00:26:51.120 --> 00:27:01.650
Brian Routh: Because keep in mind, right now, if you, if you remember back to the main problem it said under simple costing, which is what we're currently using and we know that simple costing is not as accurate as Activity Based costing which we're looking at right now.

135
00:27:02.160 --> 00:27:06.930
Brian Routh: Under simple costing we think every test costs $16.

136
00:27:08.310 --> 00:27:19.170
Brian Routh: Regardless of what contest it is whether it's a heat test or stress test, we think it costs us $16 so keep in mind our competition is probably using this method.

137
00:27:19.770 --> 00:27:31.440
Brian Routh: right here, so, for example, let's just go back to what we did last time just make up some profit let's say that everybody in our industry as $1 to the cost and that's what we charge for a test.

138
00:27:32.790 --> 00:27:41.700
Brian Routh: So under our current system, which is simple, costing we think every test cost and $16 so we're going to charge $17 for every test we give.

139
00:27:42.750 --> 00:27:47.310
Brian Routh: You with me so far, everybody following me okay so we're gonna charge $7.

140
00:27:48.540 --> 00:27:51.270
Brian Routh: How many tests do you think we're gonna sail.

141
00:27:57.570 --> 00:28:13.560
Brian Routh: A lot a lot and keep in mind that he tests are really costing us $18 and we're charging 17 so for all those he tests, because we're going to sell a lot, because our competition is charging $19.

142
00:28:14.760 --> 00:28:15.390
Brian Routh: Do you see that.

143
00:28:17.130 --> 00:28:20.640
Brian Routh: So for every test we sail we're losing $1.

144
00:28:22.320 --> 00:28:26.940
Brian Routh: Are we going to still are we going to sell any stress test we're selling them for $17.

145
00:28:28.290 --> 00:28:34.620
Brian Routh: not know if we do, and if we're if we're lucky enough to sell any stress test they're going to subsidize.

146
00:28:35.010 --> 00:28:37.350
Brian Routh: The losses on our heat test.

147
00:28:38.700 --> 00:28:48.930
Brian Routh: Do you see it because we're selling stress test for $17 apiece and our competition is selling them for about 13 or $14 apiece okay.

148
00:28:50.490 --> 00:29:04.710
Brian Routh: So we're going to make about 17 little over $4 per stress test if we're able to sell any of them if someone doesn't do their research and search out the best price and we may be lucky enough to sell one okay.

149
00:29:06.000 --> 00:29:07.020
Brian Routh: Does that make sense.

150
00:29:08.130 --> 00:29:13.470
Brian Routh: What we just talked about there okay so it's so very important to know what your true costs are.

151
00:29:13.800 --> 00:29:23.460
Brian Routh: And this is just showing us once again that activity based costing is way more accurate than simple costing using just one rate allocate all of our cost, because we can see that.

152
00:29:24.000 --> 00:29:38.910
Brian Routh: Certain tests use more hours of certain things than others, and they go through different activities, so you can't just use test hours as a as an appropriate cost driver it wouldn't be appropriate for all of our tests alright.

153
00:29:42.570 --> 00:29:44.580
Brian Routh: Any questions other questions for move on.

154
00:29:48.360 --> 00:29:48.660
Brian Routh: alright.

155
00:29:50.760 --> 00:30:04.050
Brian Routh: So we have here we have automotive products designs and produces automotive parts in 2009 actual variable manufacturing overhead is $308,600 that's our total overhead 308,600.

156
00:30:04.740 --> 00:30:16.470
Brian Routh: ap simple costing system allocates overhead to its three customers, we have three customers, we have united motors holding motors and leland vehicle free customers.

157
00:30:17.820 --> 00:30:27.870
Brian Routh: Based on machine hours so that's our simple costing allocation base or cost driver machine hours and prices it's contracts, based on full costs.

158
00:30:28.470 --> 00:30:33.480
Brian Routh: One of its customers has regularly complained of being charged non competitive prices.

159
00:30:34.140 --> 00:30:40.440
Brian Routh: So API controller devin Smith realizes that it's time to examine the consumption of overhead resources more closely.

160
00:30:41.130 --> 00:30:48.420
Brian Routh: He knows that there are three main departments that consume overhead here they are design engineering and production.

161
00:30:49.290 --> 00:30:57.960
Brian Routh: interviews with department personality examination of time records yield the following detailed information so here i'm giving you all this information, the cost driver.

162
00:30:58.590 --> 00:31:09.420
Brian Routh: The total overhead allocated each department can here's the total overhead which ultimately is how much we need to allocate, no matter what system we're using simple or Activity Based costing.

163
00:31:10.530 --> 00:31:19.890
Brian Routh: So our objective compute the overhead allocate each customer using simple costing okay simple costing.

164
00:31:23.850 --> 00:31:32.340
Brian Routh: So, again we did this last time so once we learned something new it's really hard sometimes to go back and do it the old way, but we still need to know how to do it both ways.

165
00:31:32.700 --> 00:31:40.560
Brian Routh: So again, the simple costing is using machine hours as it's one allocation based so under simple costing how many rates will we have.

166
00:31:42.780 --> 00:31:47.460
Brian Routh: One rate right if we were doing Activity Based costing right now how many rates would we have.

167
00:31:48.990 --> 00:32:04.020
Brian Routh: we'd have three very good three activities one rate for every activity, but this case we're just doing simple costing right now okay so again the the processes, the same calculate your rate which you only have one then use that rate to allocate the cost to your three customers.

168
00:32:05.340 --> 00:32:11.340
Brian Routh: Okay, so i'll give you a couple minutes to work on this on your own and then we'll come back as together and take a look at it all right.

169
00:37:26.790 --> 00:37:35.970
Brian Routh: Alright let's take a look and see how we did on this one So the first thing we have to note is the cost driver for simple costing.

170
00:37:36.450 --> 00:37:51.360
Brian Routh: It is not CAD design hours, so we don't need those it's not engineering hours we don't need those it's machine hours and here is our total machine hours if we add all those guys up that would give us our total.

171
00:37:53.190 --> 00:37:54.570
Brian Routh: And what does that equal.

172
00:37:57.060 --> 00:37:59.460
Brian Routh: 4000 4000 perfect.

173
00:37:59.730 --> 00:38:02.070
Brian Routh: So now we know our total machine hours.

174
00:38:03.210 --> 00:38:15.210
Brian Routh: And we also know our total overhead costs, so we can easily calculate our rate, so our total overhead cost about about total allocation base so that would be.

175
00:38:17.010 --> 00:38:21.270
Brian Routh: If I can find it right there okay so 308,600.

176
00:38:23.670 --> 00:38:26.850
Brian Routh: divided by the 4000 total machine hours.

177
00:38:30.240 --> 00:38:40.050
Brian Routh: So that's where we're getting that rate of $77 and 15 cents per machine hour, so the next one to calculate the rate.

178
00:38:41.070 --> 00:38:49.380
Brian Routh: Step two is to take the rate and allocate the cost to our three customers so united holding and label, so we can do that now so united.

179
00:38:49.920 --> 00:39:09.150
Brian Routh: $77 and 15 cents times the number of machine hours consumed by United because when we take the rate and multiply it times the consumption of the allocation base so united us 220 machine hours and what did you get for that.

180
00:39:13.200 --> 00:39:25.020
Brian Routh: 9259 to 58 perfect holden use 2800 machine hours, so our rate.

181
00:39:26.550 --> 00:39:29.280
Brian Routh: 2800 and what does that equal.

183
00:39:39.630 --> 00:39:40.500
Brian Routh: Perfect Thank you.

184
00:39:41.190 --> 00:39:43.590
Brian Routh: And leland used 1080.

185
00:39:45.750 --> 00:39:47.040
Brian Routh: machine hours.

186
00:39:48.210 --> 00:39:49.320
Brian Routh: And what does that equal.

188
00:39:54.660 --> 00:39:55.620
Brian Routh: Perfect Thank you.

189
00:39:56.550 --> 00:39:58.740
Brian Routh: Now, again, remember, we have a check figure.

190
00:40:00.030 --> 00:40:01.860
Brian Routh: All three of these things added up.

191
00:40:03.450 --> 00:40:10.770
Brian Routh: Should equal that 308,000 $600 did he buy check that.

192
00:40:13.050 --> 00:40:13.890
Brian Routh: Does it equal.

193
00:40:17.520 --> 00:40:24.270
Brian Routh: Whenever we've got to check figure we definitely need to take advantage of it right so see if these three things add up to 308 600.

194
00:40:25.110 --> 00:40:33.180
Brian Routh: And they may not I don't know if the $77 and 15 cent was an exact number or if there was a repeating decimal so it may be off a few dollars, if it was do these.

196
00:40:35.040 --> 00:40:37.560
Brian Routh: It work okay perfect, thank you very good.

197
00:40:38.970 --> 00:40:40.590
Brian Routh: So we are happy about that.

198
00:40:43.740 --> 00:40:45.300
Brian Routh: Any questions on this one.

199
00:40:49.770 --> 00:40:53.790
Brian Routh: Now, of course, in a second we're going to do this with Activity Based costing and then we're going to compare them.

200
00:40:54.840 --> 00:41:01.560
Brian Routh: All right, and see what's going on with with the simple costing issue alright so let's get some.

201
00:41:02.280 --> 00:41:16.680
Brian Routh: terminology in your notes, I know we've talked about it a couple of times but i'll make sure it's in your notes this idea of subsidization or cross subsidization has been one product is subsidizing another, so this is when the over.

202
00:41:17.730 --> 00:41:26.760
Brian Routh: costed product absorbs too much cost, making it seem less profitable than it really is because we've it's absorb too much costs we've over cost at it.

203
00:41:28.200 --> 00:41:29.550
Brian Routh: it's when the under.

204
00:41:30.870 --> 00:41:36.960
Brian Routh: costed product is left with two little cost, making it seem more profitable than it really is.

205
00:41:37.530 --> 00:41:44.490
Brian Routh: Okay, so we've seen this a few times we're going to see it here in just a second it's when one product is subsidizing another because of our.

206
00:41:44.970 --> 00:41:58.170
Brian Routh: Efficiency at assigning costs is where that comes down to so to not make this happen, is why we need to use Activity Based costing okay so we're more accurate with our costing more efficient.

207
00:41:59.700 --> 00:42:00.090
Brian Routh: All right.

208
00:42:02.670 --> 00:42:03.510
Brian Routh: questions.

209
00:42:07.920 --> 00:42:18.420
Brian Routh: All right, very good all right let's go to our last problem which actually is the same problem you just did except now using the exact same information.

210
00:42:19.080 --> 00:42:29.640
Brian Routh: we're going to allocate these costs to our three customers based on Activity Based costing so again, you just told me a few minutes ago there's three activities.

211
00:42:30.180 --> 00:42:40.890
Brian Routh: Therefore, will have three rates and now you're going to allocate the cost of those three customers based on those three activities okay so i'm going to put you back into your the teams, you were just in.

212
00:42:41.430 --> 00:42:47.520
Brian Routh: And I want you to finish this problem together now don't forget, I want you to go beyond this problem.

213
00:42:48.360 --> 00:42:56.190
Brian Routh: I want you to think about the two that we just did so you just did simple costing and you're about to do the activity based costing method.

214
00:42:56.790 --> 00:43:05.490
Brian Routh: So just as we've done before I want you to compare them what is happening under simple costing which product is under costed which product is over costed.

215
00:43:05.880 --> 00:43:16.290
Brian Routh: Okay, which one's subsidizing the other, in other words okay so think through that process don't just calculate the numbers, think about it okay and i'll stop into your rooms here in just a few minutes okay all right.

218
00:47:40.110 --> 00:47:44.760
Brian Routh: Okay, just hold tight we've got a few that have not okay all right.

219
00:52:10.530 --> 00:52:12.600
Brian Routh: seem to have lost a few people.

220
00:52:14.340 --> 00:52:15.510
Brian Routh: don't know what happened.

221
00:52:22.770 --> 00:52:25.440
Brian Routh: Maybe they'll come back or maybe they're still in the Red Sea.

222
00:52:28.260 --> 00:52:29.370
Brian Routh: they're still in the breakout.

223
00:52:30.780 --> 00:52:41.520
Brian Routh: No okay alright so let's um I think I was able to speak with everyone, at least for a short period of time on this one again if I didn't please forgive me.

224
00:52:42.810 --> 00:52:46.350
Brian Routh: That was my intent to speak with everyone, but I think.

225
00:52:47.460 --> 00:52:52.500
Brian Routh: we're on the right track here and, if not just stop me and ask questions as we move forward.

226
00:52:53.670 --> 00:52:59.370
Brian Routh: Alright, so now we're using Activity Based costing to allocate our total amount of overhead costs.

227
00:53:00.630 --> 00:53:19.470
Brian Routh: But you have to be careful with this we're only allocating these individual cost per activity Okay, so that was step one to calculate the rate, based on the overhead costs in that activity divided by the allocation base alright so let's take a look and see what that looked like.

228
00:53:22.140 --> 00:53:37.500
Brian Routh: So these are the rates, you should have got so Part One is the rates so I got $100 per CAD design our for design I got $80 per engineering hour for engineering and $60 per machine hour for production.

229
00:53:39.420 --> 00:53:42.900
Brian Routh: Any questions on calculating the rate or the rate.

230
00:53:44.640 --> 00:53:49.080
Brian Routh: The rate for each activity so again three activities equal three rates.

231
00:53:53.100 --> 00:53:59.940
Brian Routh: i'm just scanning through everybody to see if I see any concern on faces all right everybody's good.

232
00:54:00.990 --> 00:54:06.240
Brian Routh: Alright, so step two, then, is we take these rates to allocate the cost so step two.

233
00:54:07.020 --> 00:54:25.110
Brian Routh: So the rate for design was $100 now some of you be very careful with this if you'll write out what your rate is it's not 100 it's not $100 it's $100 per CAD design our that will help you to see what i'm supposed to multiply it by.

234
00:54:26.250 --> 00:54:35.730
Brian Routh: Okay, because some of you wanting to multiply it times $39,000 Well, we know we're not multiplying at times $35 because it's based on CAD design hours.

235
00:54:36.240 --> 00:54:45.780
Brian Routh: Okay, so just go ahead and write out the whole rate like I did here with dollars and its name that away, it makes it so much easier when you're multiplying it through okay.

236
00:54:47.160 --> 00:54:53.850
Brian Routh: Alright, so I took the hundred dollar rate multiplied it through the $80 rate multiplied it through the $60 rate multiplied it through.

237
00:54:54.660 --> 00:55:07.230
Brian Routh: And I got $39,000, which is a check figure they tell me that when I added all those across 29 six to 40 and Lo and behold, my total of 308 600 was allocated to all three of my clients.

238
00:55:08.520 --> 00:55:17.910
Brian Routh: 23,800 guy allocated to United 192 800 got allocated to holden and 92,000 got allocated to leland.

239
00:55:19.350 --> 00:55:26.820
Brian Routh: yee questions with those numbers and everybody get these totals down here and 23,801 92 890 2000.

240
00:55:28.320 --> 00:55:31.290
Brian Routh: If not you're well on your way to getting them, I hope, yes.

241
00:55:32.670 --> 00:55:36.870
Brian Routh: All right now the last part I asked you to kind of think about in your teams.

242
00:55:37.680 --> 00:55:44.490
Brian Routh: Was if you go back at the top of my screen right now, as the simple costing version at the bottom is the activity based costing version.

243
00:55:45.390 --> 00:56:03.300
Brian Routh: So at the top, is what we're currently doing this is what we think our customers are costing us at the bottom is really what they're costing us okay So who is this customer that keeps complaining, do you think is complaining about being charged non competitive prices who's complaining.

245
00:56:10.800 --> 00:56:12.810
Brian Routh: It would be holding okay.

246
00:56:12.900 --> 00:56:24.690
Brian Routh: Because this is what we think hold on it's costing us so we're charging them, maybe 250, but this is what actually holding is costing us so we probably should be charging them around to 10 to 15 something like that, whatever.

247
00:56:25.710 --> 00:56:32.070
Brian Routh: Okay, so they're the ones complaining leland and united they're pretty happy when you think.

248
00:56:33.240 --> 00:56:35.820
Brian Routh: Because holden is subsidizing both of them.

249
00:56:37.020 --> 00:56:45.840
Brian Routh: Okay, so hold it is subsidizing both united and leland so what's going to happen if we fix this problem, united and leland are going to be mad holden is going to be happy.

250
00:56:46.140 --> 00:56:52.200
Brian Routh: You know the lead and they're going to be had because their their costs are going to go way up so we may end up losing them as clients.

251
00:56:52.950 --> 00:57:02.670
Brian Routh: So you always have to think about about these things you know you have to explain things to your clients course so management management job, not the account the account is just prepare this information, give it to management.

252
00:57:03.390 --> 00:57:15.660
Brian Routh: And that's it Okay, we can give some advice on what should happen, but itself me management job to smooth it over with the clients okay any questions on Activity Based costing.